Fees and resourcing on design and construction projects
This article needs more work. To help develop this article, click 'Edit this article'.
Contents |
[edit] Calculation
Fees can have impact on client's perception of a company and so it is important to get them right.
They can be based on:
- Empirical data: practice records of previous costs.
- Calculating the cost of the resource and other requirements (renders,printing, travel etc…) of the project on stage by stage basis.
- A tool such as the RIBA fee calculator based on the cost of the resource and other requirements.
[edit] Types of fee
Fees calculated as a percentage of the final construction cost:
- Suits straightforward building projects of relatively short duration.
- Can appear to reward design consultants for an overpriced design.
- Risk to the consultants that the construction cost could be lower than anticipated.
- Can be used as a basis for fee calculation rather than a 'set in stone' agreement.
- Appropriate when the scope of the project/ required services/ programme and cost clearly defined from outset and are unlikely to change.
- It is possible to agree lump sum separately for each work stage.
- Variations may allow additional fees.
Time charges:
- Appropriate when resources or time scale cannot be predicted accurately. This is often the case in the early stages of a project.
- An agreed hourly rate per staff category / named individual.
- May include a provision for increases with inflation (12 monthly).
Additional fees:
- Standard appointments generally have provision for additional fees.
- Beware of bespoke appointments that limit additional fees to client instructions.
- Licence fees for the design if the developer uses it on other sites.
[edit] Risks and uncertainties
- Client experience/ knowledge/ reputation/relationship. It may be appropriate to carry out a credit check and speak to other firms to find out how quickly they pay/ whether they observe payment terms and so on.
- Project definition: Are the requirements clear or uncertain?
- Scale of project: Impacts planning timescales/ resource/ programme.
- Complexity of the project.
- Whether similar work has been done before.
- Programme: scale/ planning/ resource/ uncertainties such as repairs for survey/squatters.
- Other resource requirements: if a project is overseas, it may be appropriate to work with a local consultant to benefit from their knowledge.
- Local opposition/support
- Requirement to appoint sub-consultants
[edit] Key influences on resource requirements
- Type of procurement and scope of services.
- Speed
- Quality
- Project size
- Complexity
- Extent of works to existing buildings
- Repair / conservation of historic buildings
- Degree of design repetition
- Practice size and overheads
- Geographic proximity
- BIM
[edit] Benefits
- Business expansion.
- Enhanced profit.
- Employ existing staff
- New market/sector
- Quality of work
- Prestige/enhanced reputation
[edit] Key influences on brand value
- Practice reputation.
- Location.
- Culture.
- Specialist skills.
[edit] Context/benchmarking
Whilst using the points above to aid a resource-based approach to calculate feed, cross-checks are recommended to ensure that a sensible outcome has been reached. Such checks include comparing the fee to be proposed against previous similar jobs and benchmarking the proposed fee against other projects when expressed as a percentage of construction cost.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
What it is and how to use it.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.
70+ experts appointed to public sector fire safety framework
The Fire Safety (FS2) Framework from LHC Procurement.
Project and programme management codes of practice
CIOB publications for built environment professionals.
The ECA Industry Awards 2024 now open !
Recognising the best in the electrotechnical industry.
Sustainable development concepts decade by decade.
The regenerative structural engineer
A call for design that will repair the natural world.
Buildings that mimic the restorative aspects found in nature.
CIAT publishes Principal Designer Competency Framework
For those considering applying for registration as a PD.
BSRIA Building Reg's guidance: The second staircase
An overview focusing on aspects which most affect the building services industry.
Design codes and pattern books
Harmonious proportions and golden sections.
Introducing or next Guest Editor Arun Baybars
Practising architect and design panel review member.